EV startup Arrival is building an $11.5 million battery plant in NC
- Business
- December 8, 2021
English American vehicle producer Arrival today declared it intends to set up a $11.5 million battery plant in Charlotte, North Carolina. The manufacturing plant will be the organization’s third generally speaking office in the city.
It will be found simply moves back from its destined to-be-finished North American base camp. When the plant is functional, it will supply batteries to the organization’s Van “Microfactory,” making roughly 150 extra jobs.
“By bringing the assembly of our proprietary High Voltage Battery Modules in-house, we’re striving to be as vertically integrated as possible,” Arrival CEO Mike Ableson said. “This will enable us to have even greater control over the functionality and cost of our products and pass those cost savings on to the customer while also working toward our goal of zero waste production.” The company told TechCrunch the facility should have a production capacity of up to 350,000 battery modules per year.
Appearance puts everything on the achievement of its Van EV. In 2020, UPS requested 10,000 electric trucks from the automaker, with the choice to purchase 10,000 extra vehicles if everything works out positively.
The declaration comes around the same time Toyota said it would assemble a $1.29 billion battery plant in focal North Carolina.